Installer words

Solar installer words, in plain English

Quotes, contracts and scheme documents are full of shorthand. Here are the terms you're most likely to meet, each in a sentence or two, with a link to the full guide where there is one.

Checked at source on 3 November 2026 · Solar Panel Installer Guide is an independent guide from SEO-DONS LTD, not an installer

ADR
Alternative dispute resolution: an independent way to settle a complaint without going to court. MCS installers must take part in it with MCS’s provider. More
Cancellation period
For a service contract made at home or at a distance, normally 14 days from the day the contract is made. More
Commissioning
Testing a finished system and putting it into service.
Competent person scheme
A government-authorised scheme whose members can self-certify that certain building work meets building regulations.
Consumer code
A set of consumer protection standards; RECC and HIES are approved by the Chartered Trading Standards Institute. More
Consumer unit
The fuse board, where the system connects to your home’s wiring.
CTSI
The Chartered Trading Standards Institute, which approves consumer codes.
Customer Commitment
The MCS document setting out what every MCS installer must do for you; version 1.1 was issued in September 2026.
Deposit protection
An arrangement so you don’t lose a deposit if the installer fails before finishing.
DNO
Distribution network operator: the company that runs the local electricity network where you live. More
Export MPAN
The reference number for the export side of your electricity supply.
G98
The notification route for small generators, up to 16 A per phase; notified within 28 days of installation.
G99
The application route for larger generators; approval needed before installation.
Generation meter
A meter recording how much electricity the panels produce.
Handover pack
Documents left at completion: key parts, safety guidance, maintenance schedule, manuals and warranties. More
HIES
A consumer code approved by the Chartered Trading Standards Institute.
Hybrid inverter
An inverter that can manage a battery as well as panels.
Inverter
Converts the panels’ direct current into household alternating current. More
Isolator
A switch that makes part of the system safe to work on.
kWp
Kilowatts peak: a system’s total rated power under standard test conditions.
MCS
The certification scheme for small-scale renewable technologies and their installers, by technology. More
MCS certificate
The document confirming a certified installation; due within 30 days of completion.
Microinverter
A small inverter behind each panel, converting its output on the roof.
Optimiser
A unit behind a panel that reduces the effect of shade on the rest of the system.
Performance estimate
The installer’s written forecast of generation and its value, with assumptions. More
Permitted development
Work allowed without a planning application, subject to limits and conditions. More
RECC
The Renewable Energy Consumer Code, approved by the Chartered Trading Standards Institute.
SEG
The scheme under which suppliers pay for exported electricity in Great Britain.
Self-use
Electricity from your panels that you use as it’s generated.
TrustMark
A quality scheme for trades; check registration on its Find a Business listing.
Usable capacity
The energy a battery can actually deliver, usually less than its nominal capacity.
Variation
A written change to your contract, for example after the detailed design.
Workmanship warranty
The installer’s cover for problems caused by the installation; at least two years for RECC members.

Where the definitions come from

The scheme terms follow the wording of the bodies themselves: the MCS Customer Commitment, RECC, GOV.UK on competent person schemes and the Consumer Contracts Regulations, read on 3 November 2026. The full list is on our sources page.

A question about an installer or a quote?

Tell us what you're weighing up. Your message reaches SEO-DONS LTD, the publisher of this guide, and we answer by email. We don't install anything or recommend firms, but we can tell you what to check and where.

What happens next

  1. Your message reaches SEO-DONS LTD, which publishes this guide.
  2. We reply by email with the checks and sources that apply.
  3. Your choice of installer stays yours.
Add more about your home or quote (optional)

We use what you send only to answer you by email. Solar Panel Installer Guide is an independent guide, not an installer, a register or a comparison service. See our privacy notice.

Ask a question
Ask a question